Album69
  • About
  • Life
  • Travel
  • Tech
  • Galleries
  • SAP-C02 Notes
  • DOP-C02 Notes
X GitHub LinkedIn YouTube

Domain 4 Cheatsheet: Migration and Modernization

Domain 4 Cheatsheet: Migration and Modernization: condensed key facts and exam tips for the SAP-C02 exam.

Cheatsheets
October 9, 2026

Deeper notes: Domain 4 overview and the linked service guides.

Focus: select the right workload strategy, tool, target, and cutover plan. Validate service availability and current exam-guide objectives.

The 7 Rs (Terminology Varies)

StrategyCue
RetireDecommission an unneeded workload after dependency/owner validation
RetainKeep due to timing, compliance, technical constraints, or business need
RehostMove with minimal changes; MGN can replicate eligible servers to EC2
RelocateMove a supported platform/environment with limited redesign; confirm current support
RepurchaseReplace with SaaS or a different product
ReplatformMake limited cloud optimizations without a full redesign
Refactor / re-architectChange architecture to achieve business outcomes unavailable through smaller changes

Tool Selection

Work unit / requirementTool or patternNot this
Physical/virtual server rehost with block replicationAWS Transform MGNDMS or Migration Hub
Database full load + ongoing CDCAWS DMS; schema conversion assessed separatelyMGN
Online file/object copy, repeatable tasks, integrity checksDataSyncTransfer Family for bulk NAS migration
Partner SFTP/FTPS/AS2 interface to S3/EFSTransfer FamilyDataSync for per-user protocol access
Migration inventory and wave progressMigration Hub / discovery toolsData replication engine
Structured migration program, assessment, mobilizationAWS MAPTechnical migration service
Physical/offline transferCurrent eligible physical transfer optionAssume Snowball Edge is open to new customers

Cutover Checklist

  • Inventory owners, dependencies, data classification, source/target regions, licenses, and network flows.
  • Define RTO/RPO, allowed outage, freeze strategy, validation checks, go/no-go authority, and rollback.
  • Verify agent/endpoints, routes, DNS, identity, encryption, security groups, quotas, target capacity, and service compatibility.
  • Test representative workloads in target; confirm application behavior, not just infrastructure status.
  • Monitor replication/CDC lag or transfer errors; set a measurable cutover threshold.
  • Keep source systems/data recoverable until the acceptance window closes.

Modernization Choices

  • Microservices: independent business capabilities need separate scale/release/ownership; avoid distributed monoliths and shared writable databases.
  • Containers: package compatible applications; choose ECS for AWS-native simplicity, EKS for Kubernetes needs; state must live in durable external services.
  • Serverless: event-driven or variable workloads with managed operations; design for retries, idempotency, quotas, and downstream limits.
  • Database modernization: assess engine semantics, schema conversion, CDC, application SQL, performance, and cutover consistency separately.

Common Traps

  • Migration Hub tracks; it does not copy data.
  • DMS moves database data; it does not automatically convert every schema object or application query.
  • MGN rehosts servers; it does not containerize/refactor them.
  • Replication is not backup, nor proof of application consistency.
  • Physical transfer may meet bandwidth constraints but has eligibility, shipment, import, and scheduling risks.
  • “Zero downtime” requires a precise write and rollback strategy, not only a replication product.

Official References

  • Domain 4 overview
  • AWS Migration Hub
  • AWS DMS
  • AWS DataSync
  • AWS Transfer Family

      What's in this sap-c02

      • The 7 Rs (Terminology Varies)
      • Tool Selection
      • Cutover Checklist
      • Modernization Choices
      • Common Traps
      • Official References
      © Album69 2026
      X GitHub LinkedIn YouTube